Yes, the Alante has the aux relay instead of the BIM. You could easily swap that aux relay with a BIM. All the same connections on both if you wanted and that would solve the problem. The Vision on page 2 has it, but that was something they added after my production year. I have the aux relay, and at the time, I was looking to solve the issue the amp-l-start was a good, cheap fix for that. If i have to do it over again, i'm replacing my aux relay with a BIM.
Thanks for the schematic, much more detailed than mine.
__________________
Michael & Angela Foret
North Central Florida
2019 Entegra Vision 31V
|