Old 02-16-2016, 12:59 PM   #21
Senior Member
 
Join Date: May 2013
Location: Dale Hollow Lake Tn/Ky
Posts: 2,525
They saw you coming a mile away. Probably because you were hot to trot with bells and whistles w/o really knowing what it took to meet your plan. Knew a guy who had inherited a lot of $$ and ordered a custom designed Houseboat with crazy stuff. Now lots of people have special ordered hboats, but this guy went off the charts and managed to turn a $250k boat into a $375k.

Now back to the solar setup thing [which I admit I know nothing about] and see what happens if you ask someone to build you a solar system from the ground up instead of following up with an established company and picking one of there systems. Kind of like asking Jayco to build you a camper from the frame up and you pick everything.
Bassdogs is offline   Reply With Quote
Old 02-16-2016, 01:33 PM   #22
Senior Member
 
Join Date: Jun 2015
Location: Bay Area
Posts: 765
Ha ha ha, I think to some extent you may be right. Maybe it is about lithium batteries... I will start asking about a setup with AGMs and then after getting a quote I will change the specs to lithium
bono is offline   Reply With Quote
Old 02-16-2016, 01:37 PM   #23
Senior Member
 
Join Date: Jun 2015
Location: smithville, ont.
Posts: 2,677
What exactly is he going to do for 20hrs installing an inverter?
I hope he is waxing your rig and washing the roof too
__________________
2016 North Point 341RLTS
520watts of solar. Morningstar MPPT
4 6volt 235ah Surrette batteries
2017 F-350 Platinum CC SRW
klassic is offline   Reply With Quote
Old 02-16-2016, 02:56 PM   #24
Senior Member
 
Join Date: May 2013
Location: Dale Hollow Lake Tn/Ky
Posts: 2,525
Quote:
Originally Posted by bono View Post
Ha ha ha, I think to some extent you may be right. Maybe it is about lithium batteries... I will start asking about a setup with AGMs and then after getting a quote I will change the specs to lithium
There are a couple of guys here on the forum who are pretty solar savey and are well beyond the basics. I'd listen to them and follow their advice on what to buy and whats involved to get it installed since it doesn't sound like you're a DYI kind of guy. I don't think its so much about the lithium batteries other than it signals to the guy giving the quote that you're up for spending some big bucks.
Bassdogs is offline   Reply With Quote
Old 02-17-2016, 07:16 AM   #25
Senior Member
 
Join Date: Jun 2013
Location: Camp Hill
Posts: 257
I installed my own inverter in a matter of a couple or a few hours. Definitely, shop around.
__________________
2013 Jayco X23B
Solar System: Renogy 300W/Tristar 45 PWM
DC System: Trojan T-105 225 AH/Samlex PST-600 PSW
2013 RAM 1500 V6/TF8/3.55
sebring96hbg is offline   Reply With Quote
Old 02-17-2016, 07:25 AM   #26
Senior Member
 
Join Date: Apr 2014
Location: Calgary
Posts: 885
There is no way an experienced installer should take that long to install anything. Lithium vs AGM or Lead acid install times should all be the same. They just use slightly different equipment.
He should do all that in a day. Maybe a day and a half if he is a perfectionist.
I installed my solar system over the course of two days having never done it before and with many 2 and 3 year old distractions and "help".

I would say it is an 8-10 hour job.
__________________
2014 Jayco Swift 281BHS, 300W Solar!
2015 F250 XLT 4x4 Crew Cab, Short box, 6.2 gas
Subaru297 is offline   Reply With Quote
Old 02-17-2016, 09:02 AM   #27
Senior Member
 
Seann45's Avatar
 
Join Date: Jun 2010
Location: Saskatoon Sask Canada
Posts: 10,714
I talked to Solar Mike yesterday he said 8-10 hours MAX..
__________________
Seann
2004 Chev Silverado Duramax optioned past the max. 2009 Jayco Eagle 308 RLS 900watts of solar, Lithium batteries (400amp hour), 2000 watt (4000 surge) whole house inverter.
145days boondockinig in2023 2022/151 2021[/COLOR]
93/2020,157/2019219/2018 206/2017,215/2016, 211/2015, 196/14, 247/13, 193/12

Seann45 is offline   Reply With Quote
Old 02-17-2016, 10:46 AM   #28
Senior Member
 
Join Date: May 2012
Location: Castro Valley
Posts: 225
The number of hours does not surprise me. Installation does take some time and you are asking for a lot of components. I'm sure AM Solar would do a really good job.

Just a side note: Did you see the article in the latest Trailer Life magazine about installing solar? They installed an AM Solar system with lithium batteries and all the works...maybe the article could help you understand all that is involved and why it could take such a long time. If you can't pick up a copy, PM me and I will send you the article. Best of luck...
__________________
2018.5 Lance 2185 with 320 watts of Solar
2016 Chevy Silverado 2500 Duramax

ddrueckh is offline   Reply With Quote
Old 02-17-2016, 06:19 PM   #29
Site Team
 
Mustang65's Avatar
 
Join Date: Nov 2012
Location: Clearwater, FL area
Posts: 5,196
If you do decide to go with the LiFePO4 battery system you may want to keep this information available... Just in case.. Not saying you will ever need it... but the information is good to have

If fire or explosion occurs when batteries are on charge, shut off power to charger. In case of fire where lithium iron phosphate batteries are present, flood the area with water. If any batteries are burning, water may not extinguish them, but will cool the adjacent batteries and control the spread of fire. CO2, dry chemical, and foam extinguishers are preferred for small fires, but also may not extinguish burning lithium iron phosphate batteries. Burning batteries will burn themselves out. Virtually all fires involving lithium iron phosphate batteries can be controlled with water. When water is used, however, hydrogen gas may be evolved which can form an explosive mixture with air. LITH-X (powdered graphite) or copper powder fire extinguishers, sand, dry ground dolomite or soda ash may also be used. These materials act as smothering agents. Fire fighters should wear self-contained breathing apparatus. Burning lithium iron phosphate batteries can produce toxic fumes including HF, oxides of carbon, aluminum, lithium, copper, and cobalt. Volatile phosphorus pent fluoride may form at a temperature above 230º Fahrenheit.

I believe that they also make a special fire extinguisher for use on these batteries.. I ran across it when I was researching LiFePO4 a few years ago. I decided to wait a few more years.

Don
__________________
2013 Jayco Eagle 284BHS
2012 Ford F150XLT, EcoBoost w/3.73,Max Tow Pkg.
Our Solar Album https://www.jaycoowners.com/album.php?albumid=329
Mustang65 is offline   Reply With Quote
Old 02-18-2016, 12:20 AM   #30
Senior Member
 
Join Date: Jun 2015
Location: Bay Area
Posts: 765
Thank you guys for all useful information!

Ddrueckh- are you referring to this article?

A Powerful Transformation

I just found a new report on solar powered AC

Off Grid Solar Powered RV Air Conditioning - Is it Possible? - Gone With The Wynns
bono is offline   Reply With Quote
Old 03-07-2016, 01:57 PM   #31
Senior Member
 
Join Date: Jun 2015
Location: Bay Area
Posts: 765
I have received another fee quote for labour only

Install Roof Top Solar Panels x 4, Wire panels to Combiner box thru RV Roof & Seal
Wire to Controller
Wire to Meter
Wire to Safety switches & Batteries, Anchor system & Test

Subtotal: $1,850


INVERTER: Install Inverter, Shunt, Monitor & Temp Sensor, Chase Wires & Test

Subtotal: $1,400

Remove 12v Battery(s) & Install 300Ah Lithium battery, Set up BMS system

Subtotal: $500

Total: $3,750

This looks better than the first quote I received. Still based on your feedback, probably this is a high side of the pricing (unless they charge $200 / hour).

Thanks!
bono is offline   Reply With Quote
Old 03-07-2016, 03:35 PM   #32
Senior Member
 
Join Date: Jun 2013
Location: Camp Hill
Posts: 257
Quote:
Originally Posted by bono View Post
I have received another fee quote for labour only

Install Roof Top Solar Panels x 4, Wire panels to Combiner box thru RV Roof & Seal
Wire to Controller
Wire to Meter
Wire to Safety switches & Batteries, Anchor system & Test

Subtotal: $1,850


INVERTER: Install Inverter, Shunt, Monitor & Temp Sensor, Chase Wires & Test

Subtotal: $1,400

Remove 12v Battery(s) & Install 300Ah Lithium battery, Set up BMS system

Subtotal: $500

Total: $3,750

This looks better than the first quote I received. Still based on your feedback, probably this is a high side of the pricing (unless they charge $200 / hour).

Thanks!

This is all just labor?
__________________
2013 Jayco X23B
Solar System: Renogy 300W/Tristar 45 PWM
DC System: Trojan T-105 225 AH/Samlex PST-600 PSW
2013 RAM 1500 V6/TF8/3.55
sebring96hbg is offline   Reply With Quote
Old 03-07-2016, 03:59 PM   #33
Member
 
Join Date: Feb 2016
Location: Yellowknife
Posts: 84
Quote:
Originally Posted by bono View Post
I have received another fee quote for labour only

Install Roof Top Solar Panels x 4, Wire panels to Combiner box thru RV Roof & Seal
Wire to Controller
Wire to Meter
Wire to Safety switches & Batteries, Anchor system & Test

Subtotal: $1,850


INVERTER: Install Inverter, Shunt, Monitor & Temp Sensor, Chase Wires & Test

Subtotal: $1,400

Remove 12v Battery(s) & Install 300Ah Lithium battery, Set up BMS system

Subtotal: $500

Total: $3,750

This looks better than the first quote I received. Still based on your feedback, probably this is a high side of the pricing (unless they charge $200 / hour).

Thanks!

Hmmmmm ..... remove 12v Batteries .... My concern would be how is your RV's 12v system going to work with the new batteries. and as mentioned before. How are you going to isolate the components that need 12v when the RV is being towed?

And before I forget .....

Wow ..... if you include parts ..... you'd be looking at a price tag of 8-10K once its all done.

Kind Regards;

Ingo

Kind Regards;

Ingo
ArcticFire is offline   Reply With Quote
Old 03-07-2016, 05:07 PM   #34
Senior Member
 
Join Date: Jun 2015
Location: Bay Area
Posts: 765
Yes, this is labor only. Actually, I am thinking about $10-12k price tag.

In relation to technical matters - I have no idea how does it work, I am planning to pay guys who know the stuff. I won't be a test pilot. Many people are using similar setups.
bono is offline   Reply With Quote
Old 03-18-2016, 02:15 PM   #35
Senior Member
 
Join Date: Jun 2015
Location: Bay Area
Posts: 765
Quote:
Originally Posted by Seann45 View Post
I talked to Solar Mike yesterday he said 8-10 hours MAX..
Seann, I have talked to Solar Mike and when time comes I think I will have him to install the setup. Thank you very much for suggesting him.
bono is offline   Reply With Quote
Reply

Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


» Featured Campgrounds

Reviews provided by

Powered by vBadvanced CMPS v3.2.3
Disclaimer:

This website is not affiliated with or endorsed by Jayco, Inc. or any of its affiliates. This is an independent, unofficial site.


All times are GMT -6. The time now is 03:58 AM.


Powered by vBulletin® Version 3.8.8 Beta 1
Copyright ©2000 - 2024, vBulletin Solutions, Inc.
Copyright 2002-2016 Social Knowledge, LLC All Rights Reserved.