Which Multiple Stage Charge Controller has Priority??
My TT has three charge controllers that are potentially charging my batteries at the same time .....I think. I don't have a lot of electrical background so my assumption could be wrong.
I have a Progressive Dynamics PD9245C that charges my battery when on shore power, I have a Victron MPPT 50A solar controller for 360 watts of roof mounted panels, I have a Renogy PWM 30A solar controller for 200 watts of portable solar panel suitcases that connect through the solar side port mounted on my trailer tongue.
Which of the multiple stage charge controllers takes priority if there are two or more operational at the same time??
Some of them have different volt settings for the same battery charging stage.
__________________
2018 Jay Flight SLX 212QBW Rocky Mountain Edition
2016 Ford F-150 XLT 4x4 SuperCrew 3.5L Ecoboost
HD Towing Package 145" WB
Andersen WDH
560 watts solar, roof mounted and portable suitcases
2000 watt PSW Inverter
|